Free delivery in Windhoek on orders over N$2,000  ·  Quotes within one business dayFree Windhoek delivery over N$2,000
Cart (0)
All Products Brands Digital Catalogues Specials & Clearance
Gifting 3,089
Clothing 1,613
Sportswear & Teamwear 832
Headwear 214
Workwear 436
Display 584
Hampers & Sets 159

My Account Cart Request Quote
In Stock - 2,739 available
Barron SKUBAR-HUX-JAC

Huxley Jacket

N$917.56

Price excludes 15% VAT. Branding and delivery excluded unless stated.

Stock by colour 2 of 2 colours in stock · 2,739 units · 990 incoming
ColourIn stockIncoming
Navy 2,018 —
Black 721 990 · 8 Mar

Supplier stock, refreshed daily. Size split is shown once you choose a colour.

Stock item. Order online unbranded, or request a quote to add your logo.

Select options to continue

Choose colour, size to view the exact stock, price, and add-to-cart availability.

Request Branding Quote Quotes answered within 1 business day Ask a question on WhatsApp

Online orders are supplied unbranded, with a minimum order total of N$1,000.00 (incl. VAT). Want your logo on it? Request a branding quote.

SKU: BAR-HUX-JAC Categories: ,
Estimated delivery: 3-7 business days nationwide

Description

Huxley Jacket.

  • Two piece sleeve with velcro tab
  • Panelled body with top-stitching throughout
  • Chest pocket with zip opening
  • Lightweight bonded fabric
  • Textured surface
  • Side pockets with zip opening
  • 300g 96% Polyester 4% Spandex bonded fabric

Stock item: order online unbranded, or request a quote to have your logo added in our Windhoek studio. Delivered across Namibia.

Additional information

Weight N/A
Colour

Black, Navy

Size

S, M, L, XL, 2XL, 3XL, 4XL, 5XL

Branding guidelines Logo setup for this product
Methods DTF (Direct to film), Embroidery, Heat Press
Branding positions
  • Left Sleeve (100mm x 60mm)
  • Right Chest (100mm x 60mm)
  • Left Chest (100mm x 60mm)
  • Back (100mm x 60mm)
  • Right Sleeve (100mm x 60mm)
  • Back Yoke (10cm x 10cm)

Send vector artwork (PDF, AI, EPS or SVG) with your quote — we confirm the method, setup and lead time before production.